All notes

Production readiness
What Your AI Builder Actually Ships You — A Field Guide

A comprehensive field guide examining the four failure categories of AI-built applications: security gaps, scalability limits, error handling deficiencies, and adaptability constraints that determine whether your MVP is production-ready.

Aug 9, 2026 · 12 min read
Production readiness
The Readiness Score: How We Grade an App Across Six Pillars

A production readiness score grades your app across six pillars—functionality, reliability, security, performance, observability, and maintainability—so you can trade the vague feeling that the app works for one honest number and a ranked list of what to fix before launch.

Jul 26, 2026 · 5 min read
Production readiness
The Six Pillars of a Production-Ready App (and Where Vibe-Coded MVPs Skip Each One)

What separates a production-ready app from a working demo? Six pillars across runtime integrity and change integrity — and why hardening a vibe-coded MVP beats a rewrite.

Jul 26, 2026 · 4 min read
How it works
Ingest, Diagnose, Fix, Harden, Deploy: How the Pipeline Works

A five-stage productionizing pipeline — ingest, diagnose, fix, harden, and deploy — carries a working vibe-coded app the last twenty percent of the way to production without a rewrite, a full build team, or shipping it unhardened.

Jul 26, 2026 · 4 min read
Production readiness
Prototype vs. Production: Why "It Works" Isn't "It's Ready"

A working prototype and a production-ready app are different products. See what separates a demo that works from a product you can sell, and what to fix first: data protection, reliability, correctness, and maintainability.

Jul 26, 2026 · 5 min read
Security
Session Fixation — When Logging In Doesn't Actually Log Anyone In

A single missing line of code is the difference between a login that protects your users and one that quietly hands an attacker a pre-authenticated key while the legitimate user watches a welcome screen load.

Jul 20, 2026 · 6 min read
Load more